Remodeling cost guide · Bucks & Montgomery County

What a remodel really costs in Bucks County.

Planning ranges for kitchens, bathrooms and additions at three finish levels, so you can see where your project might land before your first meeting.

Want a number for your home? Call 215-372-0040, Mon to Fri, 8:00am to 4:30pm

Get a price range for your project

Book a free in-home consultation in one short form. A project consultant will reach out within one business day.

Start my free consultation

No obligation. We’ll never share your information.

Kitchen remodel, Newtown, PA

3 levelsEssential, Curated and Signature
5–7%final price lands within this of your PDA budget
1 numberfixed and itemized before construction
2 yearsworkmanship guarantee

Investment levels

What should you budget, by project and finish level?

Every Ryann Reed project is a true design-build remodel at one of three levels. Pick your size to see where your project might land. Two projects of the same size can land in different places depending on how much the layout changes.

EssentialCuratedSignature

Kitchen remodel

Medium Kitchen. The typical suburban kitchen: an L or U layout with an island or peninsula and one secondary zone such as a coffee station or desk.

Most Ryann Reed kitchens (Curated)$100k to $150k

EssentialFinish Kitchen Update
$70k to $100k
CuratedDesigned Kitchen Remodel
$100k to $150k
SignatureKitchen Reimagining
$150k to $225k+

What moves the price

  • Cabinetry. The biggest line item, with the widest range in quality.
  • Countertops. Fabrication, seams and edges matter as much as the material.
  • Layout changes. Moving walls, plumbing and gas changes the whole scope.
  • Lighting and electrical. Many older homes need more circuits than the panel can give.
  • Tile and backsplash. Installation craft matters as much as the tile.
  • Fixtures and hardware. Chosen as one coordinated finish program.
  • Scope beyond the kitchen. Adjoining rooms you decide to update while we are there.
What each level includes

Essential: Finish Kitchen Update. Our full design-build process, an itemized agreed price and the same two-year workmanship guarantee as every level, applied to a finish-focused scope.

Curated: Designed Kitchen Remodel. A complete design-build kitchen: storage planned around how you cook, coordinated surfaces and finishes, a full lighting plan and targeted layout improvements.

Signature: Kitchen Reimagining. Fully custom cabinetry, individually selected stone, a complete lighting program, and structural changes that open the kitchen to the rest of the home.

Included and not included
  • A dedicated designer and Project Consultant from first visit through final walkthrough
  • Measured plans, cabinet elevations and 3D views, with unlimited revisions within your defined scope
  • Bi-weekly selection meetings in our Langhorne showroom until every finish is chosen
  • Appliance package specified and planned into cabinetry, ventilation and utilities
  • An itemized final agreement with every selection specified before construction begins
  • Cabinets, counters, tile and fixtures ordered and confirmed before demolition
  • Dedicated project management with schedule and selections in your JobTread client portal
  • A two-year workmanship guarantee from substantial completion
  • Appliance purchase (design, specification and installation coordination are included)
  • Design fee (7% of your Project Development Agreement budget)
  • Township permit and inspection fees, billed back at cost
  • Concealed conditions found during demolition and any required remediation
  • Owner-provided items, furniture and window treatments
  • Flooring, paint and lighting in adjoining rooms, unless added to your scope during design

These are general planning ranges for kitchens in Bucks County, Montgomery County and the Philadelphia suburbs. They are not a quote, bid or contract. Your firm number comes after design and selections, once your scope is defined, and figures are reviewed periodically as material, labor and site conditions change.

What most kitchen quotes leave out

A kitchen remodel is rarely just a kitchen. When a quote looks lower than expected, it usually covers less than expected. These are the costs we discuss with you up front, so none of them arrive mid-project.

When the kitchen opens to the first floor. New flooring carried into the dining or family room for continuity, paint and lighting to match the new finish program, and trim that suddenly looks dated next to new cabinetry.

When the footprint grows. A butler's pantry, a coffee or wet bar, a mudroom connection or a powder room refresh often joins the project once design begins. Each is priced as its own line.

What lives inside the walls. Electrical panel capacity, outdated wiring or plumbing, uneven subfloors and moisture behind the sink. Known conditions are priced in; unknown ones are handled by documented change order before work proceeds.

Living without a kitchen. A temporary kitchen setup, more meals out and storage for displaced items. Your project manager shares the schedule weekly so you can plan around the most disruptive days.

Timeline
4–8weeks
Design and selections: measurements, renderings, showroom meetings, final agreement
3–6weeks
Procurement and permits: cabinets, counters, tile and fixtures ordered and confirmed
6–12weeks
Construction: demolition, rough-in, cabinets, countertops and finish work
4–6months
Total from first conversation to finished kitchen
Kitchens

Bathroom remodel

Primary Bath. The bathroom off your primary bedroom. Typically a double vanity, a walk-in shower and often a freestanding or soaking tub.

Most Ryann Reed bathrooms (Curated)$60k to $95k

EssentialFinish Bathroom Update
$40k to $60k
CuratedDesigned Bathroom Remodel
$60k to $95k
SignatureBathroom Reimagining
$95k to $150k+

What moves the price

  • Shower and tub configuration. An acrylic base and a custom tiled shower are very different projects.
  • Vanity and storage. Stock sizes versus a vanity built around the room.
  • Layout changes. Moving a toilet or drain changes the whole plumbing scope.
  • Tile and installation craft. Pattern, trim and layout planning matter as much as the tile.
  • Waterproofing and what is behind the walls. The part you never see is the part that matters most.
  • Lighting and ventilation. Sconces at the mirror and a fan that actually clears the room.
  • Scope beyond the bathroom. Closets, hallways and the bath next door.
What each level includes

Essential: Finish Bathroom Update. Our full design-build process, an itemized agreed price and the same two-year workmanship guarantee as every level, applied to a finish-focused primary bath.

Curated: Designed Bathroom Remodel. A complete design-build primary bath: a shower and vanity planned around how you use the room, coordinated tile, stone and fixtures, and a full lighting and ventilation plan.

Signature: Bathroom Reimagining. Fully custom cabinetry, individually selected stone, a complete lighting program and the layout changes that make the room a different space.

Included and not included
  • A dedicated designer and Project Consultant from first visit through final walkthrough
  • Measured plans, elevations and 3D views, with unlimited revisions within your defined scope
  • Bi-weekly selection meetings in our Langhorne showroom until every finish is chosen
  • A named shower waterproofing system installed to manufacturer standards
  • An itemized final agreement with every selection specified before construction begins
  • Vanities, tops, tile, glass and fixtures ordered and confirmed before demolition
  • Dedicated project management with schedule and selections in your JobTread client portal
  • A two-year workmanship guarantee from substantial completion
  • Window treatments and décor items
  • Design fee (7% of your Project Development Agreement budget)
  • Township permit and inspection fees, billed back at cost
  • Concealed conditions found during demolition and any required remediation
  • Owner-provided items, furniture and window treatments
  • Closets, hallways and adjoining rooms, unless added to your scope during design

These are general planning ranges for bathrooms in Bucks County, Montgomery County and the Philadelphia suburbs. They are not a quote, bid or contract. Your firm number comes after design and selections, once your scope is defined, and figures are reviewed periodically as material, labor and site conditions change.

What most bathroom quotes leave out

A bathroom remodel is rarely just a bathroom. When a quote looks lower than expected, it usually covers less than expected. These are the costs we discuss with you up front, so none of them arrive mid-project.

When the bathroom expands. Borrowing space from a closet or hallway for a larger shower or double vanity, and the framing, flooring and trim work that follows.

When the rooms next door change. Hallway paint, flooring transitions and doors that look dated next to the new bath, or a second bathroom refreshed while trades are on site. Each is priced as its own line.

What lives inside the walls. Rotted subfloor around old toilets and tubs, failed waterproofing behind tile, undersized drains or vents, and new circuits for heated floors and fans. Known conditions are priced in; unknown ones are handled by documented change order before work proceeds.

Living with one less bathroom. Shared bathrooms, adjusted morning routines and storage for displaced items. Your project manager shares the schedule weekly so you can plan around the most disruptive days.

Timeline
4–8weeks
Design and selections: measurements, renderings, showroom meetings, final agreement
3–6weeks
Procurement and permits: vanities, tops, tile, glass and fixtures ordered and confirmed
4–8weeks
Construction: demolition, rough-in, waterproofing, tile, glass and finish work
3–5months
Total from first conversation to finished bathroom
Bathrooms

Addition

Two-Story Addition. About 600–1,000 sq ft of finished space. Typically a primary suite above a family room, office or first-floor suite, with two or more wet rooms.

Most Ryann Reed additions (Curated)$425k to $575k

EssentialLivable Space Addition
$325k to $425k
CuratedFully Designed Addition
$425k to $575k
SignatureArchitectural Addition
$575k to $850k+

What moves the price

  • Size, stories and footprint. More rooms and a second floor add foundation, framing and roof.
  • Wet rooms. Every bathroom and laundry adds plumbing, tile, ventilation and fixtures.
  • Mechanical strategy. Extending existing systems versus adding new ones.
  • Where the addition meets the house. Matching siding, roof, trim and floors to the existing home.
  • Interior finish program. Tile detailing, quartz, cabinetry, closets and millwork.
  • Scope beyond the footprint. Existing rooms you decide to update while we are there.
  • Site and township. Surveys, stormwater, zoning and permit requirements.
What each level includes

Essential: Livable Space Addition. Our full design-build process, an itemized agreed price and the same two-year workmanship guarantee as every level, applied to a focused footprint.

Curated: Fully Designed Addition. A complete, coordinated addition: new systems, two finished baths, designed storage and an exterior that blends with the original home.

Signature: Architectural Addition. Fully custom cabinetry, premium cladding and windows, advanced systems and finishes carried into the connected rooms of your existing home.

Included and not included
  • A dedicated designer and Project Consultant from first visit through final walkthrough
  • Site survey and measurements, architectural drawings and sealed engineered drawings for permitting
  • Floor plans, elevations and 3D views, with unlimited revisions within your defined scope
  • Bi-weekly selection meetings in our Langhorne showroom until every finish is chosen
  • An itemized final agreement with every selection specified before construction begins
  • Permits pulled on your behalf, in-house carpentry crews and vetted trade partners
  • Dedicated project management with schedule and selections in your JobTread client portal
  • A two-year workmanship guarantee from substantial completion
  • Design fee (7% of your Project Development Agreement budget)
  • Township permit and inspection fees, billed back at cost
  • Site plans, surveying, civil engineering and stormwater management if your township requires them
  • Concealed conditions found during demolition and any required remediation
  • Owner-provided items, appliances, furniture and window treatments
  • Work in existing rooms beyond the connection point, unless it is added to your scope during design

These are general planning ranges for additions in Bucks County, Montgomery County and the Philadelphia suburbs. They are not a quote, bid or contract. Your firm number comes after design and selections, once your scope is defined, and figures are reviewed periodically as material, labor and site conditions change.

What most addition quotes leave out

When an addition quote looks lower than expected, it usually covers less than expected. These are the costs we discuss with you up front, so none of them arrive mid-project.

Where the addition meets the house. Siding replaced across adjoining elevations so the new and old walls match, roof tie-ins, paint carried to the nearest corner, flooring transitions, and trim matched to existing profiles.

Things that have to move. Bilco doors, generator hookups, HVAC condensers, radon vents, gutters and downspouts sitting where the new foundation goes.

Township and site requirements. Surveys, site plans, stormwater management and zoning review vary widely by township and are priced once your township's requirements are known.

What lives inside the walls. Electrical service capacity, undersized framing, moisture or rot at the connection wall. Known conditions are priced in; unknown ones are handled by documented change order before work proceeds.

Timeline
6–10weeks
Design and selections: survey, plans, renderings, showroom meetings, final agreement
4–10weeks
Engineering and township permitting, which varies by municipality
3–7months
Construction, from excavation through final walkthrough, depending on addition type
6–12months
Total from first conversation to finished addition
Additions

Basement remodel

Full finished basements, not single rooms. Based on our recent projects, what clients actually invested including changes along the way.

Typical projectabout $110k

Most projectsmiddle half
$100k to $175k
Full range
$95k to $265k

Based on our last 6 finished basements.

What moves the price

  • Bathrooms and kitchenettes. Plumbing below grade is the biggest swing in a basement budget.
  • Bars, built-ins and theaters. A wet bar or custom millwork adds cabinetry, counters and electrical.
  • Egress windows. Needed for a legal bedroom, with excavation and a window well.
  • What the basement starts with. Moisture work, ceiling height and ductwork to reroute.
Basements

How your number is set

From first budget to final agreement, with no surprises

Your investment is confirmed in three steps. At each one, you see exactly what changed and why, and you approve it before we move forward.

Learn about design-build
  1. Project Development Agreement

    We define your project's scope, set your tier and agree on a construction budget. The PDA states what stays where it is, what moves, and which adjoining rooms are in or out. For the scope as written, your final price is expected to land within 5–7% of this budget depending on finishes.

  2. Design and Selections

    Design often reveals opportunities: a larger island, a shower borrowed from a closet, a deck off the new office. Every idea that adds scope is priced as its own line on a running Budget Tracker, and every selection above your tier is shown as an upgrade. Nothing is folded in quietly.

  3. Final Agreement

    Your final proposal reconciles back to the PDA in one simple view: the original budget, each scope addition you approved and each upgrade you chose. You sign one fixed, itemized number before construction begins.

Your final agreement

How every final agreement reconciles to your PDA

PDA budget

The scope and tier you approved at the start

+ Finish variance

Up to 5–7% as selections are finalized within your tier

+ Added scope

Layout changes, adjoining rooms and other work you chose to add, each priced

+ Upgrades

Selections above your tier, each shown against the standard

= Final agreement

One fixed, itemized number you sign

★★★★★
“Ryann Reed Design Build was amazing to work with! They were responsive to all of our questions, and they worked closely with us to realize our vision. I knew that we were working with the best.”
Gayle P. · Whole home remodel · Read more reviews

Questions

What homeowners ask before a consultation

How much does a kitchen remodel cost in Bucks County?

For a typical medium kitchen, an Essential update that keeps your layout runs about $70,000 to $100,000, a Curated remodel $100,000 to $150,000, and a Signature kitchen that reshapes the first floor $150,000 to $225,000 or more. Most Ryann Reed kitchens land at the Curated level.

How much does a bathroom remodel cost?

Bathrooms range from about $15,000 for a powder room refresh to $150,000 or more for a reimagined primary bath. A primary bath runs about $40,000 to $60,000 at the Essential level, $60,000 to $95,000 Curated and $95,000 to $150,000 or more Signature. Most of our bathrooms land at the Curated level.

How much does it cost to finish a basement?

Our recent finished basements mostly ran between about $100,000 and $175,000, with a typical project around $110,000. Bathrooms, a wet bar or kitchenette and egress windows move the number most. You get a written budget range at your consultation, before design starts.

How much does a home addition cost?

Additions range from about $95,000 for a well-built bump-out to $850,000 or more for a two-story architectural addition. A two-story addition runs about $325,000 to $425,000 at the Essential level, $425,000 to $575,000 Curated and $575,000 to $850,000 or more Signature.

Why are these numbers higher than online cost calculators?

National calculators average every kind of job across the country, including DIY and partial projects. Our ranges are complete design-build projects in Bucks and Montgomery County: design, 3D renderings, permits, every trade, project management and a two-year warranty.

Is the consultation free?

Yes. The in-home consultation is free and there is no obligation. You leave with a better sense of scope and the level that fits your budget.

Where do you work?

We're based in Langhorne and remodel homes across Bucks and Montgomery County, PA. Not sure if you're in our area? Call or send the form and ask.

Do you handle permits and inspections?

Yes. We prepare the drawings, pull the permits and schedule every inspection and specialty installer, so you don't have to coordinate anything.

Is there a warranty?

Yes. Every project comes with a two-year warranty, and your care guides live in your client portal.

See where your project might land

Start with an in-home consultation, then visit our Langhorne showroom to see a first design and talk through the level that fits your budget.