Kitchen remodel
Medium Kitchen. The typical suburban kitchen: an L or U layout with an island or peninsula and one secondary zone such as a coffee station or desk.
Most Ryann Reed kitchens (Curated)$100k to $150k
- EssentialFinish Kitchen Update
- $70k to $100k
- CuratedDesigned Kitchen Remodel
- $100k to $150k
- SignatureKitchen Reimagining
- $150k to $225k+
What moves the price
- Cabinetry. The biggest line item, with the widest range in quality.
- Countertops. Fabrication, seams and edges matter as much as the material.
- Layout changes. Moving walls, plumbing and gas changes the whole scope.
- Lighting and electrical. Many older homes need more circuits than the panel can give.
- Tile and backsplash. Installation craft matters as much as the tile.
- Fixtures and hardware. Chosen as one coordinated finish program.
- Scope beyond the kitchen. Adjoining rooms you decide to update while we are there.
What each level includes
Essential: Finish Kitchen Update. Our full design-build process, an itemized agreed price and the same two-year workmanship guarantee as every level, applied to a finish-focused scope.
Curated: Designed Kitchen Remodel. A complete design-build kitchen: storage planned around how you cook, coordinated surfaces and finishes, a full lighting plan and targeted layout improvements.
Signature: Kitchen Reimagining. Fully custom cabinetry, individually selected stone, a complete lighting program, and structural changes that open the kitchen to the rest of the home.
Included and not included
- A dedicated designer and Project Consultant from first visit through final walkthrough
- Measured plans, cabinet elevations and 3D views, with unlimited revisions within your defined scope
- Bi-weekly selection meetings in our Langhorne showroom until every finish is chosen
- Appliance package specified and planned into cabinetry, ventilation and utilities
- An itemized final agreement with every selection specified before construction begins
- Cabinets, counters, tile and fixtures ordered and confirmed before demolition
- Dedicated project management with schedule and selections in your JobTread client portal
- A two-year workmanship guarantee from substantial completion
- Appliance purchase (design, specification and installation coordination are included)
- Design fee (7% of your Project Development Agreement budget)
- Township permit and inspection fees, billed back at cost
- Concealed conditions found during demolition and any required remediation
- Owner-provided items, furniture and window treatments
- Flooring, paint and lighting in adjoining rooms, unless added to your scope during design
These are general planning ranges for kitchens in Bucks County, Montgomery County and the Philadelphia suburbs. They are not a quote, bid or contract. Your firm number comes after design and selections, once your scope is defined, and figures are reviewed periodically as material, labor and site conditions change.
What most kitchen quotes leave out
A kitchen remodel is rarely just a kitchen. When a quote looks lower than expected, it usually covers less than expected. These are the costs we discuss with you up front, so none of them arrive mid-project.
When the kitchen opens to the first floor. New flooring carried into the dining or family room for continuity, paint and lighting to match the new finish program, and trim that suddenly looks dated next to new cabinetry.
When the footprint grows. A butler's pantry, a coffee or wet bar, a mudroom connection or a powder room refresh often joins the project once design begins. Each is priced as its own line.
What lives inside the walls. Electrical panel capacity, outdated wiring or plumbing, uneven subfloors and moisture behind the sink. Known conditions are priced in; unknown ones are handled by documented change order before work proceeds.
Living without a kitchen. A temporary kitchen setup, more meals out and storage for displaced items. Your project manager shares the schedule weekly so you can plan around the most disruptive days.
Timeline
Design and selections: measurements, renderings, showroom meetings, final agreement3–6weeks
Procurement and permits: cabinets, counters, tile and fixtures ordered and confirmed6–12weeks
Construction: demolition, rough-in, cabinets, countertops and finish work4–6months
Total from first conversation to finished kitchen